To the central content area
:::
:::

MTD Introduction

Marine Technology Development Division

Positioning、Vision & Mission

Vision : Develop Xingda Harbor into a marine-tech hub
Position : marine technology innovation & industrialization platform
Mission :

  • Develop underwater technology (UT) & engineering solutions:Develop O&M techniques & standards for offshore wind foundations, build a service supply chain for UT & engineering solutions to support the marine industry.
  • Develop marine bio-resources (MB):Develop scalable technical solutions for smart aquaculture, high quality processing and high value-added products using MB, linking with local industries and activating local economy.
Marine Technology Development Division

Target Customers

  • Offshore wind O&M industry:Technical training on underwater structure safety inspection, maintenance and anti-corrosion methods, cultivate underwater service technicians and talent.
  • UT industry:Localized production of key components such as ROV robotic arm, propeller, sonar, etc.
  • Aquaculture in Southern Taiwan:Demo site for smart aquaculture, one-stop service integrating advanced MB raw material processing, product prototyping, marketing and distribution.

MTD Floor Plan

  • Pilot plants on the ground floor
  • Laboratories on the second floor
  • Office on the third floor
Floor Allocation
MTD floor plan

Ground Floor Allocation (3,998.49m2)

  • Underwater Vehicle R&D Lab
  • Marine Anti-corrosion Engineering Lab
  • Underwater Structure Inspection Lab
  • Intelligent Aquatic Value-added Lab
  • 6 standard pilot plants
Ground Floor
Ground Floor

First Floor Allocation(397.46m2)

  • Lounge
First Floor
First Floor

Second Floor Allocation(2,588.62m2)

  • 1 lecture room (80 seats)
  • 8 offices
  • 2 meeting rooms
  • Pre-treatment and High-pressure Processing Lab
  • Marine Biotechnology Product Development Pilot Plant
Second Floor
Second Floor

Third Floor Allocation(2,222.78m2)

  • 2 meeting rooms
  • 1 copy room
  • 1 lactation room
  • 1 file room
  • 1 storage room
  • 1 control room
  • 12 offices
Third Floor
Third Floor

Rentable Space

Ground floor (Standard Pilot plant)
NO. Area Setup
D102 181.58 m² Air compressor:7Bar(80-120 psig)
5T crane pedestal
Supply & drainage system
Air and heating vents on the wall
380V、220V、110V electricity
D103 365.41 m²
D104 298.39 m²
D105 383.25 m²
D108 382.66 m²
D111 192.92 m²
Second floor (Incubation Room)
NO. Area Setup
D301 99.61 m² Air compressor:7Bar(80-120 psig)
Supply & drainage system
Air and heating vents in the wall
380V 、220V、110V electricity
D306 96.43 m²
D307 97.27 m²
D308 92.9 m²
D309 98.53 m²
D310 99.45 m²
D311 99.01 m²
D312 85.13 m²
Third floor (Meeting room)
NO. Area Setup
D401 101.9 m²  
D406 345.25 m²  
Third floor (Office)
NO. Area Setup
D402 162.78 m²  
D403 25.28 m²  
D404 22.05m²  
D405 56.4m²  
D407 144.62m²  
D408 20.49m²  
D409 20.49m²  
D410 29.58m²  
D411 23.4m²  
D412 22.41m²  
D413 38.22m²  
D417 116.77m²  
Contact : Ya-Hu Yu / Tel : +886-7-6988899 Ext:7200 / E-mail : ritayu@mail.mirdc.org.tw
Go To Top